Quick answer: Timing Chain Replacement on a 2011–2014 Ford F-150 is rated Expert and takes about 15-20 hours. You'll need 9 tools for this job, and parts cost about $1,466. This guide walks you through the full job step by step, including the mistakes to avoid.
| Part Name |
Part Number |
Price |
Buy |
| Timing Chain Kit with Water Pump (primary + 2 secondary chains, guides, tensioners, crank sprocket) |
9-0738SBWP |
$495.00 |
|
| Cam Phaser Set, 4 VCT Units (2 intake Melling VCTA-1005I, 2 exhaust Melling VCTA-1005E) |
— |
$720.00 |
|
| VCT Solenoids, Set of 4 |
CM-5089 |
— |
|
| Front Crankshaft Seal Kit |
TCS 46117 |
$17.00 |
|
| Motorcraft Orange Coolant Concentrate VC-3-B, 2 Gallons (mix 50/50 with distilled water) |
VC-3-B |
$134.00 |
|
| Motorcraft 5W-30 Full Synthetic Engine Oil, 6 Quarts |
XO-5W30-Q1FS |
$87.00 |
|
| Motorcraft Oil Filter FL-500S |
FL-500S |
$13.00 |
|
About prices: shown prices are typical retail averages and change frequently; cheaper alternatives may be available. Confirm the current price before buying.
💡 Pro tip: Order all parts at once to save on shipping
Step-by-Step Instructions
Follow these steps carefully
1
Confirm the diagnosis
This guide covers the 3.5L EcoBoost V6 only. The 3.7L V6, 5.0L V8 and 6.2L V8 in these trucks use different timing systems. The classic symptoms are a loud metallic rattle from the front of the engine for 2 to 5 seconds on a cold start, especially after the truck has sat 6 hours or more, and codes P0016, P0011, P0012, P0021 or P0022. Ford TSB 17-0026 ties P0016 on 2011-2014 trucks to a worn primary chain: if the VCT_INT_ACT1 reading is +6 degrees or more, Ford calls for the primary chain. TSB 18-2305 covers the cold-start rattle and calls for all four VCT units plus the primary chain, about 9.2 labor hours. Check the oil level and condition first: low or worn-out oil starves the phasers and mimics the same rattle.
2
Drain fluids and disconnect the battery
Let the engine cool fully, then disconnect the negative battery terminal. Drain the engine oil and drain the cooling system into clean pans. You will refill both at the end of the job.
3
Clear the front of the engine
Remove the air intake assembly, the cooling fan, the radiator hoses and the serpentine belt, plus any accessories blocking the front of the engine. Label every connector and hose as you go.
4
Remove the intake manifold and valve covers
Remove the upper intake manifold, then both valve covers. The VCT solenoids sit on the front of each cylinder head and come out with their housings later in the job, so leave them in place for now.
5
Remove the lower oil pan
Remove the lower oil pan. This step is required: several front cover bolts sit behind it, and the cover cannot come off with the pan in place.
6
Lock the engine at top dead center
Rotate the crankshaft by hand to top dead center on cylinder 1 compression stroke, timing mark at 4 o'clock. Install the crankshaft and camshaft holding tools before touching any timing component. Do not rotate the engine again until the new chains are on and timed.
🔧 Mechanic's note — Ray Delgado
I've seen a 3.5 EcoBoost jump time because someone bumped the crank after the holding tools came off. Once those tools are on, I treat the crank like it's wired to a bomb and I don't touch it until the chains are timed.
7
Remove the harmonic balancer and front cover
Remove the harmonic balancer with a 3-jaw puller and a holding tool. Remove all front cover bolts and note their varying lengths so each one goes back in the same hole, pry the front cover off. The timing chains, phasers, guides and tensioners are exposed.
8
Remove the VCT solenoid housings
Each VCT solenoid housing is held by 3 bolts. Remove both housings and pull them straight outward to release them from the phasers. Inspect the solenoid screens for sludge or metal debris.
9
Release the tensioners and remove the old timing set
Use wedge tools to carefully release tension on the primary and secondary chains. Remove the chains, guides and tensioners. Remove the TP55 Torx Plus bolts holding the cam phasers and slide the phasers off. These bolts are torque-to-yield and single-use: discard them, do not reuse them. A regular Torx bit will round these bolts off, use Torx Plus TP55 only.
🔧 Mechanic's note — Ray Delgado
I keep a dedicated TP55 Torx Plus socket in my timing kit because a regular Torx bit will round these phaser bolts off in about two seconds, and then you're drilling a bolt out of a camshaft. Ask me how I know.
10
Replace the water pump and front crankshaft seal
The water pump is chain-driven and lives behind the front cover, so replace it now while access is free. Install the new front crankshaft seal at the same time. Inspect the old chain for stretch, the guides for cracking and the tensioners for full extension.
11
Install the new phasers with new bolts
Slide the new phasers onto the camshafts and install NEW torque-to-yield bolts. Torque each bolt in four stages: 30 lb-ft, loosen one full turn, 89 in-lb, then a final 90 degrees with a torque angle gauge. Hold the camshafts with the holding tool while torquing.
12
Install the secondary chains, then the primary chain
Install the secondary chains first. Then route the primary chain: align the single gold link on each phaser timing mark, route the chain under the idler and water pump, and split the double gold link over the timing mark on the crankshaft sprocket. Double-check every mark before moving on: this is an interference engine, and one tooth off bends valves.
🔧 Mechanic's note — Ray Delgado
I count the gold links out loud and mark each one with a paint pen before I route the chain, because once the cover is back on, one tooth off means pulling the whole front of the engine apart again.
13
Install the new guides and tensioners
Install the new chain guides and tensioners and torque their bolts to 89 in-lb. Manually activate the secondary tensioners after installation: removing the shipping clip does not activate them.
14
Reinstall the front cover
Clean both sealing surfaces, apply RTV sealant to the front cover as specified, and reinstall the cover, torquing the bolts in sequence. Reinstall the harmonic balancer with a NEW torque-to-yield crankshaft bolt: 89 lb-ft, loosen one full turn, 37 lb-ft, then a final 90 degrees.
15
Reassemble and refill
Reinstall the lower oil pan, valve covers, intake manifold, serpentine belt, cooling fan and hoses. Replace the VCT solenoids while the housings are accessible. Refill with 6 quarts of 5W-30 full synthetic oil with a new FL-500S filter, and refill the cooling system with Motorcraft Orange coolant mixed 50/50 with distilled water. Reconnect the battery.
16
Start, verify and road test
Start the engine and listen: the cold-start rattle should be gone. Check for oil and coolant leaks around the front cover, oil pan and valve covers. Clear any codes with a scan tool, then road test and recheck the oil and coolant levels once warm.
All Done!
Test your repair before closing everything up. If something doesn't work right, double-check your steps.
⚠️ Common Mistakes to Avoid
- • Replacing only the chain and reusing worn phasers, guides and tensioners: the rattle comes back within months.
- • Reusing the old torque-to-yield phaser or crank bolts.
- • Lining up the wrong colored links: the primary chain has a single gold link per phaser mark and a double gold link split over the crank mark.
- • Forgetting to manually activate the secondary tensioners after installing them.
- • Using a regular Torx bit instead of a Torx Plus TP55 on the phaser bolts and rounding them off.
- • Skipping the lower oil pan removal and forcing the front cover off.
- • Mixing coolant types: use Motorcraft Orange only, never green coolant.